000 00452nam a22001337a 4500
003 BML
100 _aGagan Bajpai
245 _aTo reduce the fuel tank stripe rejection cost in frame assembly from 0.70 CPV (cost per vehicle) to 0.35 CPV (cost per vehicle) on assembly line 1
260 _aBML Munjal University
_bSchool of engineering and technology
_cJune, 2018
300 _a54
650 _aProject report
700 _aGagan Bajpai
942 _2ddc
_cPR
999 _c6645
_d6645